Thursday, July 25, 2019

Wool processing

On the wool front — I am reserving one big bag of wool (probably three or four fleeces) unwashed for a workshop in September, but besides that, I have 6 fleeces on what I hope is their final soak (that is determined by how nasty the water is after an hour - if it still looks like mud, it gets clean water, if t looks clean enough, I call it done) and ONE that needs to be skirted and washed. 


ONE more fleece!!!! 


Yea!!!! Because I have doctor tomorrow, and I want to not have to do lots of bending and lifting after that. 

No comments:

Post a Comment